Hoag Hospital – ECU & Imaging (Newport Beach, CA)

entry-217-img-639606672

Project Description

Client:
Hoag Hospital,
Kemp Brothers Construction

Location:
Newport Beach, California

Year Completed:
2012

Project Value:
$ 387,365

Architect:
RBB Architects

Products / Strategic Partners:
ARDEX Americas, Armstrong Flooring Inc.,
Dal Tile, Tarkett | Johnsonite

Project Summary

Vision:
Develop a modern ER and Imaging Department within the existing structural confines of a working ER and Imaging Unit. The Design: Extensive use of a wood looking vinyls combined with borders of solid vinyls to create a rich and warm look combined with the functionality and clean ability of self-coved and heat welded vinyl.

Construction :
The 650,000 contract began in 2007 and was completed in December of 2012. Universal Metro worked hand in hand with Kemp Bros. and the hospital. The hospital stated that the team answered the question – “How can I keep the hospital in operation serving patients, avoiding disruption to the daily routines of the campus during construction?”

Install:
Universal Metro estimated, budgeted, procured, and installed all floor coverings on the project: sheet vinyl, heat welding, resilient tile, ceramic tile, porcelain tile, carpet, carpet tile, base cove (millworks for design element), Ardex underlayments, Ardex MC moisture mitigation systems Johnsonite Base cove.
 

California Proton Treatment Center (San Diego, CA)

entry-215-img-1632137568

Project Description

Client:
Scripps Proton Therapy

Location:
San Diego, California

Surface Area:
102,000 SF

Year Completed:
2013

Project Value:
$ 594,255

Architect:
Haskell Interiors

Products / Strategic Partners:
ARDEX Americas, Armstrong Flooring Inc.,
Dal Tile, Henry Adhesives, Mannington,
Mohawk, Roppe


Project Summary

Vision:
Develop the leading proton therapy institute in the world in collaboration with Scripps Medical Center. Partner with Varien Medical Systems and Advanced Particle Therapy by providing the most advanced healing radiation machinery available. Develop the facility in order to protect all other diagnostic and outpatient treatments from radiation (15’thick slabs were constructed).

Design:
Extensive use of a “Grand Gallery” lobby that links the facility to the open spaced diagnostic and outpatient treatment areas and into the “Healing Gardens” which in combination with the warm floor and wall color palette create healing elements to inspire and maintain the patients quality of life during treatment.

Construction:
The 102,000 square foot facility was designed with Building Information Modeling to facilitate the integrated network of mechanical, electrical, concrete shielding systems, overall layout and floor design.

Install:
Universal Metro estimated, budgeted, procured, and installed all floor coverings on the project: sheet vinyl, heat welding, resilient tile, ceramic tile, porcelain tile, carpet, carpet tile, base cove (millworks for design element), Ardex underlayments, Ardex MC moisture mitigation systems (to solve the moisture levels with 15’of concrete), and Johnsonite stair treads (for patient safety).

Unique Installation Strategy:
Universal Metro worked hand in hand with the Design Build Team and the Building Information Modeling systems put in place and create the first of its kind facility in the world. From the air freighting of specials materials to meet the needs of the most technologically advanced equipment and computers in the world to solving the moisture problems of 15′ of concrete Universal Metro managed and guided the floor covering product scope from inception to completion. With 102,000 sf of floorcovering to be coordinated and installed in four main areas of the facility, UMI worked closely with the Haskell Design Team in daily and weekly meetings to overcome the avalanche of issues that come from building a first time industry leading building. Our 30 years of expertise combined with our “Project Engineering system” was the key in the keeping pace with the constant changes and difficult requirements.