California Proton Treatment Center (San Diego, CA)

entry-215-img-1632137568

Project Description

Client:
Scripps Proton Therapy

Location:
San Diego, California

Surface Area:
102,000 SF

Year Completed:
2013

Project Value:
$ 594,255

Architect:
Haskell Interiors

Products / Strategic Partners:
ARDEX Americas, Armstrong Flooring Inc.,
Dal Tile, Henry Adhesives, Mannington,
Mohawk, Roppe


Project Summary

Vision:
Develop the leading proton therapy institute in the world in collaboration with Scripps Medical Center. Partner with Varien Medical Systems and Advanced Particle Therapy by providing the most advanced healing radiation machinery available. Develop the facility in order to protect all other diagnostic and outpatient treatments from radiation (15’thick slabs were constructed).

Design:
Extensive use of a “Grand Gallery” lobby that links the facility to the open spaced diagnostic and outpatient treatment areas and into the “Healing Gardens” which in combination with the warm floor and wall color palette create healing elements to inspire and maintain the patients quality of life during treatment.

Construction:
The 102,000 square foot facility was designed with Building Information Modeling to facilitate the integrated network of mechanical, electrical, concrete shielding systems, overall layout and floor design.

Install:
Universal Metro estimated, budgeted, procured, and installed all floor coverings on the project: sheet vinyl, heat welding, resilient tile, ceramic tile, porcelain tile, carpet, carpet tile, base cove (millworks for design element), Ardex underlayments, Ardex MC moisture mitigation systems (to solve the moisture levels with 15’of concrete), and Johnsonite stair treads (for patient safety).

Unique Installation Strategy:
Universal Metro worked hand in hand with the Design Build Team and the Building Information Modeling systems put in place and create the first of its kind facility in the world. From the air freighting of specials materials to meet the needs of the most technologically advanced equipment and computers in the world to solving the moisture problems of 15′ of concrete Universal Metro managed and guided the floor covering product scope from inception to completion. With 102,000 sf of floorcovering to be coordinated and installed in four main areas of the facility, UMI worked closely with the Haskell Design Team in daily and weekly meetings to overcome the avalanche of issues that come from building a first time industry leading building. Our 30 years of expertise combined with our “Project Engineering system” was the key in the keeping pace with the constant changes and difficult requirements.

 

entry 673 img 1810796265

Beverly Hospital Cosmetic Upgrade (Montebello, CA)

entry-673-img-1810796265

Project Description

Client:
Beverly Hospital

Location:
Montebello, California

Surface Area:
41,600 SF

Year Completed:
2017

Project Value:
$ 680,475

Architect:
SWA Architects

Products / Strategic Partners:
ARDEX Americas, Armstrong Flooring Inc.,
Mannington, Tandus Centiva,
Tarkett | Johnsonite

Project Summary

Vision:
Operating in buildings constructed in the 1960s and early ’70s, Beverly Hospital put forth an initiative in 2016 to cosmetically upgrade their primary facilities, including the Emergency Department (6,300 SF), Main Entrance (3,500 SF), Cafeteria (2,000 SF), Conference Rooms (3,800 SF), and all corridors accessible to patients and visitors, from the Basement Level through the Fifth Floor (approx. 26,000 SF). Designs compliment the architecture of the past, while gracefully modernizing the finishes.

Design:
Without major changes to the original shell, designers set out to incorporate architectural elements like interior brickwork into their design, while reinvigorating the nostalgia of the over 50 year old buildings with past-century, pastel wall colors and a heavy reliance on the contemporary and timeless beauty of Mannington’s Paradigm Collection to set the mood for each rejuvenated space. Wayfinding accents were incorporated using Mannington’s seamless transitional patterns, like Streamline, Flow, and Intersect, and carpet became the centerpiece of each room it was used in, including the Main Lobby, Cafeteria, and Conference Rooms, with beautiful styles from Tandus and Mannington.

Construction:
Balancing census and capacity constraints with a need to open corridors to traffic at the end of each shift, Universal Metro worked with the General Contractor and facility’s Project Manager to provide demolition of existing floor covering and substrate remediation at the front end of each phase, providing walkable paths of travel, prior to installing on subsequent shifts. Moisture Control was necessary in several areas, and due to structural changes between wood, concrete, and even, Terrazzo substrates, Ardex’s primer and self leveler were commonly used with Ardex MC Rapid, when necessary. With more than 75 total phases, each consisting of at least two days or nights, crews worked around the clock to complete the project within 11 months. Spray adhesives and faster setting underlayments were vital to afford the hospital with a quick-turnarounds during each phase. The end result was a beautiful throwback to yester-year’s architecture, and beautiful new modern finishes.