Dignity Health BEIP – Northridge Hospital

entry-806-img-1750922271

Project Description

Client:
Dignity Health

Location:
Northridge, California

Surface Area:
97,000 SF

Year Completed:
2017

Project Value:
$ 839,733

Architect:
Devenney Group

Products / Strategic Partners:
American Olean, ARDEX Americas,
Armstrong Flooring Inc., Tarkett | Johnsonite

Project Summary

Vision:
Dignity Health operates a number of aging campuses where significant effort and time must be invested to improve campus and building aesthetics. These improvements were needed to upgrade the “look and feel” of the campus, furthering Dignity Health’s ongoing commitment to improve the appearance, operation, and functionality of each hospital campus, while providing quality and outstanding services to the people and communities served.

Design:
“Hello humankindness” became the inspiration for this BEIP project, as Dignity Health’s corporate vision was ingrained into the renovation of Northridge Hospital’s 409-bed acute care medical center. The “Light of Day” Interior Finishes were designed to inspire healing: mind, body, and spirit. Flooring finishes became the centerpiece for this project, bringing over six floors and more than 97,000 SF back to life with a re-energized, cosmetic face-lift. Combining natural woods in sheet vinyl and LVT finishes with natural tones and textures in 12″ x 24″ VCT, patient care areas were restored with vibrance and new energy. Finishes included Armstrong Raffia VCT (installed with running bond and accent colors) in most corridors, elevator lobbies, and nurses’ stations; Armstrong’s Natural Creations LVT in the Cafeteria; a variety of sheet goods from Johnsonite / Tarkett, including Acczent Wood fields surrounded by complimentary solid homogenous sheet from their iQ Natural line; glass tile accents from American Olean made an impact on wet walls, and Johnsonite rubber base and transitions complimented trims throughout.

Construction:
Coordination of this six-story renovation was vital over the course of the 11-month time frame. Each phase was methodically planned, working with directors, hospital leadership, CMs, PMs, Superintendents, and multiple trade foremen to reduce adverse patient impacts, while promoting an efficient pace that allowed for accessibility at shift’s end when necessary and a strict attention to design detail, always. Extreme moisture conditions were alleviated with Ardex’s MC Rapid Moisture Control System using V1200 Self Leveling and K60 Leveling Compound to off-set extreme leveling needs after revelation of ceramic under mulitple layers of resilient demo. Walkable traffic was necessary within hours, as high impact areas, like the Cafeteria, remained open during work. Phasing forced intricate patterns to be cut in half with plastic containments, forcing crews to interlace and double-back efforts to ensure consistency and quality. Coordination and communication were vital, as this project, which originated out of general budgets, was specified on the fly, as field conditions following Universal Metro’s demolition revealed how unforeseen variables would be addressed, both from the design of Devenney Group’s architects and with the technical expertise of Universal Metro’s mechanics.

 

entry 805 img 509108736

Providence St. Joseph Bi-Plane Angiography (Burbank CA)

entry-805-img-509108736

Project Description

Client:
Providence Health

Location:
Burbank, California

Surface Area:
2,104 SF

Year Completed:
2017

Project Value:
$ 9,615

Architect:
C|A Architects

Products / Strategic Partners:
ARDEX Americas, Mannington

Project Summary

Vision:
Providence’s commitment to Mannington Commercial is strong, and is especially evident in the products that their designers specify. Using a combination of both cherry toned, Realities wood-grain sheet vinyl and the linen-like style of Paradigm sheet vinyl, C|A Architects provided a natural and soothing environment within the space that has become synonymous with the Providence brand. Understated in many ways, this space was still elegant and contemporary. With such heavy equipment moving into the space, the flooring design was used to accent a beautiful machine, while helping to set a peaceful tone for those entering the space to undergo testing.

Construction:
In order to accommodate this installation, floor preparation was essential. First, moisture tests revealed that Moisture Control would be necessary, and thus, Ardex MC Rapid was used to alleviate the risk of moisture failure in one primary room of the project. Within the equipment room itself, Siemens – the manufacturer of the Biplane Angiography machine – required a level surface in order to ensure proper balance in the equipment. As such, Universal Metro self leveled the suite, using Ardex K60, providing a flat, smooth, and level substrate, ready for new sheet vinyl and a very sophisticated piece of equipment. Mannington’s sheet vinyl was installed to perfection – providing a stunning, natural palette to a beautiful new space.
 

entry 215 img 1632137568

California Proton Treatment Center (San Diego, CA)

entry-215-img-1632137568

Project Description

Client:
Scripps Proton Therapy

Location:
San Diego, California

Surface Area:
102,000 SF

Year Completed:
2013

Project Value:
$ 594,255

Architect:
Haskell Interiors

Products / Strategic Partners:
ARDEX Americas, Armstrong Flooring Inc.,
Dal Tile, Henry Adhesives, Mannington,
Mohawk, Roppe


Project Summary

Vision:
Develop the leading proton therapy institute in the world in collaboration with Scripps Medical Center. Partner with Varien Medical Systems and Advanced Particle Therapy by providing the most advanced healing radiation machinery available. Develop the facility in order to protect all other diagnostic and outpatient treatments from radiation (15’thick slabs were constructed).

Design:
Extensive use of a “Grand Gallery” lobby that links the facility to the open spaced diagnostic and outpatient treatment areas and into the “Healing Gardens” which in combination with the warm floor and wall color palette create healing elements to inspire and maintain the patients quality of life during treatment.

Construction:
The 102,000 square foot facility was designed with Building Information Modeling to facilitate the integrated network of mechanical, electrical, concrete shielding systems, overall layout and floor design.

Install:
Universal Metro estimated, budgeted, procured, and installed all floor coverings on the project: sheet vinyl, heat welding, resilient tile, ceramic tile, porcelain tile, carpet, carpet tile, base cove (millworks for design element), Ardex underlayments, Ardex MC moisture mitigation systems (to solve the moisture levels with 15’of concrete), and Johnsonite stair treads (for patient safety).

Unique Installation Strategy:
Universal Metro worked hand in hand with the Design Build Team and the Building Information Modeling systems put in place and create the first of its kind facility in the world. From the air freighting of specials materials to meet the needs of the most technologically advanced equipment and computers in the world to solving the moisture problems of 15′ of concrete Universal Metro managed and guided the floor covering product scope from inception to completion. With 102,000 sf of floorcovering to be coordinated and installed in four main areas of the facility, UMI worked closely with the Haskell Design Team in daily and weekly meetings to overcome the avalanche of issues that come from building a first time industry leading building. Our 30 years of expertise combined with our “Project Engineering system” was the key in the keeping pace with the constant changes and difficult requirements.

 

entry 673 img 1810796265

Beverly Hospital Cosmetic Upgrade (Montebello, CA)

entry-673-img-1810796265

Project Description

Client:
Beverly Hospital

Location:
Montebello, California

Surface Area:
41,600 SF

Year Completed:
2017

Project Value:
$ 680,475

Architect:
SWA Architects

Products / Strategic Partners:
ARDEX Americas, Armstrong Flooring Inc.,
Mannington, Tandus Centiva,
Tarkett | Johnsonite

Project Summary

Vision:
Operating in buildings constructed in the 1960s and early ’70s, Beverly Hospital put forth an initiative in 2016 to cosmetically upgrade their primary facilities, including the Emergency Department (6,300 SF), Main Entrance (3,500 SF), Cafeteria (2,000 SF), Conference Rooms (3,800 SF), and all corridors accessible to patients and visitors, from the Basement Level through the Fifth Floor (approx. 26,000 SF). Designs compliment the architecture of the past, while gracefully modernizing the finishes.

Design:
Without major changes to the original shell, designers set out to incorporate architectural elements like interior brickwork into their design, while reinvigorating the nostalgia of the over 50 year old buildings with past-century, pastel wall colors and a heavy reliance on the contemporary and timeless beauty of Mannington’s Paradigm Collection to set the mood for each rejuvenated space. Wayfinding accents were incorporated using Mannington’s seamless transitional patterns, like Streamline, Flow, and Intersect, and carpet became the centerpiece of each room it was used in, including the Main Lobby, Cafeteria, and Conference Rooms, with beautiful styles from Tandus and Mannington.

Construction:
Balancing census and capacity constraints with a need to open corridors to traffic at the end of each shift, Universal Metro worked with the General Contractor and facility’s Project Manager to provide demolition of existing floor covering and substrate remediation at the front end of each phase, providing walkable paths of travel, prior to installing on subsequent shifts. Moisture Control was necessary in several areas, and due to structural changes between wood, concrete, and even, Terrazzo substrates, Ardex’s primer and self leveler were commonly used with Ardex MC Rapid, when necessary. With more than 75 total phases, each consisting of at least two days or nights, crews worked around the clock to complete the project within 11 months. Spray adhesives and faster setting underlayments were vital to afford the hospital with a quick-turnarounds during each phase. The end result was a beautiful throwback to yester-year’s architecture, and beautiful new modern finishes.